A manufacturing plant answers to several regulators at once. It needs a factory licence, pollution control consents, fire safety approval where the law applies, and a steady flow of returns after start-up. Its electricity bill is also shaped by regulation.
Adynta Consulting helps manufacturing companies in Gujarat see these requirements together, plan them in the right order and keep them current. We work from the current law, not older checklists.
Last reviewed:
What a manufacturing plant has to manage
The exact list depends on the activity, the site and the scale. A plant in Gujarat usually deals with:
- A factory licence under the Occupational Safety, Health and Working Conditions Code, 2020 (the OSH Code), which deals with the approval and licensing of factories. For factories, the State Government is the regulator.
- Pollution control consents from the Gujarat Pollution Control Board: consent to establish (CTE) before the unit is set up, and consent to operate before it starts. In Gujarat the operating consent is the Consolidated Consent and Authorisation (CCA).
- Hazardous waste authorisation under the Hazardous Waste Rules, 2016, where the plant handles such waste.
- A fire safety certificate under the Gujarat Fire Prevention and Life Safety Measures Act, 2013, where the Act applies to the building.
- Environmental clearance under the EIA Notification, 2006, if the project is of a listed type and size.
See factory licence and GPCB consents in Gujarat for how we plan these approvals.
Rules that changed recently
- Factory law. The OSH Code has been in force since 21 November 2025. It defines a factory mainly by the number of workers: 20 or more where power is used, or 40 or more without power, unless State law sets a different number. Guidance written under the Factories Act, 1948 may be out of date.
- Consent to operate. Central guidelines on water consents, amended in January 2026, treat consent to operate as valid until cancelled. We check how GPCB applies this to a given unit.
- Captive power. The rule that sets the captive tests (Rule 3 of the Electricity Rules, 2005) was amended in September 2023. A captive arrangement set up earlier may need a fresh check against the text in force.
Duties after start-up
Approvals are the start, not the end. Several laws create recurring duties, for example:
- registration of the establishment, and registers, notices and returns under the OSH Code;
- an annual environmental statement to the State Board under the Environment (Protection) Rules, 1986, for units that hold pollution consents or a hazardous waste authorisation;
- records and an annual return under the Hazardous Waste Rules;
- renewal of the fire safety certificate, where the Gujarat Fire Act applies.
To assign each duty to an owner and track it, see Adynta Compliance Monitoring.
Power costs and incentives
Electricity is a regulated cost. GERC sets tariffs for Gujarat's distribution companies, and electricity duty is charged under the Gujarat Electricity Duty Act, 1958.
- Electricity duty exemption. The Gujarat Electricity Duty Act, 1958 exempts some consumption. For example, in the Act's text consolidated to 2016, electricity used by a new industrial undertaking is exempt for five years from the start of production, if the undertaking holds an eligibility certificate and meets the prescribed conditions. We confirm the current text and rules for your unit. See electricity duty exemption and incentives.
- Green power. Under the central Green Energy Open Access Rules, 2022, a consumer with a contracted demand or sanctioned load of 100 kW or more can seek green energy open access. GERC's Green Energy Open Access Regulations, 2024 use the same 100 kW limit and allow it to be met through one connection or several connections in the same electricity division of a distribution licensee. The 100 kW limit does not apply to captive consumers. See green energy open access and captive power advisory.
How Adynta Consulting helps manufacturers
- an applicability check: which licences, consents and registrations apply to your plant;
- approvals for a new plant or an expansion, in a workable order: approvals to set up an industry in Gujarat;
- applications, renewals and amendments across departments: statutory approvals and government liaison;
- a register of recurring duties with owners and reminders: Adynta Compliance Monitoring;
- a review of power procurement options and charges: power sector regulatory advisory.
We do not promise approvals, timelines or savings. Read more about how we work.
FAQs
Does the OSH Code apply to our factory?
The OSH Code has been in force since 21 November 2025. Premises are a factory if a manufacturing process runs with 20 or more workers using power, or 40 or more without power, unless State law sets a different number. We confirm the position for your plant before you apply.
Do we need both a factory licence and GPCB consent?
Usually, yes. They come from different laws. The factory licence comes under the OSH Code; for factories, the State Government is the regulator. Pollution control consent comes from the Water Act and the Air Act, and is granted by the State Board, which in Gujarat is GPCB. Whether your unit needs consent depends on its category and the current central and GPCB notifications; we check this for your unit.
Does every manufacturing unit need GPCB consent?
Whether your unit needs consent depends on its category and the current central and GPCB notifications; we check this for your unit.
Which recurring filings does a factory usually have?
Common examples are registers and returns under the OSH Code, an annual environmental statement to the State Board, an annual hazardous waste return where relevant, and renewal of the fire safety certificate where the Gujarat Fire Act applies. The full list depends on your plant.
Can a manufacturing plant buy green power through open access?
Under the central Green Energy Open Access Rules, 2022, a consumer with a contracted demand or sanctioned load of 100 kW or more can seek green energy open access. GERC's Green Energy Open Access Regulations, 2024 use the same 100 kW limit and allow it to be met through one connection or several connections in the same electricity division of a distribution licensee. The 100 kW limit does not apply to captive consumers. Whether it saves money depends on charges that GERC sets and revises.
Official sources
Sources: official and government copies of the rules this page refers to. Check the latest version on the issuing authority's website before relying on any text.
- Occupational Safety, Health and Working Conditions Code, 2020 (indiacode.nic.in)Text as enacted in 2020; in force since 21 November 2025; later amendments not checked.
- Control of Water Pollution (Grant, Refusal or Cancellation of Consent) Amendment Guidelines, 2026 (dste.py.gov.in)Issued by MoEFCC on 23 January 2026; official copy hosted by the Puducherry Pollution Control Committee. Read with the 2025 guidelines it amends.
- Gujarat Fire Prevention and Life Safety Measures Act, 2013 (indiacode.nic.in)Text of the 2013 Act on India Code; later amendments may not be included.
- Gujarat Electricity Duty Act, 1958 (indiacode.nic.in)Text on India Code as modified up to 31 October 2016; later amendments are not included.
- Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022 (merc.gov.in)Issued by the Ministry of Power in June 2022; official copy hosted by the Maharashtra Electricity Regulatory Commission. Later amendments not included.
- GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024: Statement of Reasons (gercin.org)GERC's statement of the final wording of its 2024 regulations; the regulations have been amended since.
Disclaimer. This page is general information about our services. It is not legal advice or a legal opinion, and it does not say that any rule applies, or does not apply, to your circumstances. Adynta Consulting is not a law firm. Approvals, consents and tariffs are decided by the authorities concerned. Legal references checked as of 5 November 2026. Always confirm against the official text.
Discuss your requirement
Tell us what you need help with. We will review it and reply with the next steps.